CISR17050 | The Scheme: secondary legislation: regulation 4
From HM Revenue & Customs · Construction Industry Scheme Reform Manual
This regulation deals with the monthly return: to be read in conjunction with FA04/S70.
The return should be made in a format approved by HMRC by 19th of each month by any contractor making contract payments in that tax month SI2005/2045 reg 4(1).
The contractor’s name, UTR and AO reference; the tax month covered by the return; the subcontractor’s name, NINO or CRN; and information as specified in sub-section (3) must be included on the return: SI2005/2045 reg 4(2).
The following additional information to be included on the return
if the subcontractor is registered for gross payment
the UTR, and
the total amount of contract payments made: SI2005/2045 reg 4(3)(a).
if the subcontractor is registered for net payment
the UTR
the total amount of contract payments made
the value of materials
the total amount of deductions made: SI2005/2045 reg 4(3)(b).
if the subcontractor is not registered for the scheme
the UTR
the total amount of contract payments made
the value of materials
the total amount of deductions made at the higher rate
the verification reference for the higher rate deduction: SI2005/2045 reg 4(3)(c).
The return may be submitted electronically: SI2005/2045 reg 4(4).
The following declarations must be made by the contractor on the return
none of the subcontractors listed are engaged under contracts of employment
where necessary, subcontractors have been verified
all required information has been entered on the return and that it is complete and accurate: SI2005/2045 reg 4(5).
Where the return is not electronically submitted, it must be signed by the contractor or a person duly authorised by them: SI2005/2045 reg 4(6).
The contractor must keep records to support the return: SI2005/2045 reg 4(7).
The contractor must provide net registered subcontractors with a written receipt or notification showing
the contractor’s name and employer reference
the tax month to which the payment relates or date of payment
subcontractor’s name and UTR
total amount of contract payments made during the tax month
total value of materials
total of deductions made from payments
where the subcontractor is not registered for the scheme, the verification reference: SI2005/2045 reg 4(8).
The contractor can provide the receipt electronically if the subcontractor agrees and the information is capable of being stored and also printed in paper form if required: SI2005/2045 reg 4(9).
Where a mainstream contractor (those within FA04/S59(1)(a)) who has previously made CIS returns has made no contract payments during the tax month, they must submit a nil return, not later than 14 days after the end of the relevant tax month (SI2005/2045 reg 4(9A)), unless they have notified HMRC of a period of inactivity (SI2005/2045 reg 4(9B)). The notification must be made within 14 days of the start of the tax month to which the notification relates.
TMA70/S98A penalties (SI2005/2045 reg 4(12)) only apply for returns with a filing date of 19th October 2011 and earlier. From the filing date of 19th November 2011 and later the legislation under which CIS penalties are issued became FA09/SCH55.
TMA70/S98A penalties arise for each month or part of a month during which a failure to make a return continues after the 19th day of the sixth month following the appointed day: SI2005/2045 reg 4(13).
ENABLING PROVISION - FA04/S70 (1) & (2)