Skip to content
Solved
SearchBrowse
Sign in

Contents

Official guidance
National Minimum Wage Manual

NMWM07000 · Types of work

  • NMWM07010 · The four types of work
  • NMWM07020 · Salaried hours work
  • NMWM07025 · Confirming salaried hours work: flowchart
  • NMWM07030 · Salaried hours work conditions: basic annual hours
  • NMWM07034 · Salaried hours work conditions: annual salary
  • NMWM07036 · Salaried hours work conditions: other payments and unpaid hours
  • NMWM07038 · Salaried hours work: pay intervals
  • NMWM07040 · Time work
  • NMWM07050 · Confirming time work
  • NMWM07060 · Output work
  • NMWM07070 · Confirming output work
  • NMWM07080 · Output work: rated output work (from 1 October 2004)
  • NMWM07090 · Output work: fair estimate agreement (before 1 October 2004)
  • NMWM07100 · Unmeasured work
  • NMWM07110 · Confirming unmeasured work
  • NMWM07120 · Unmeasured work: daily average agreement
  • NMWM07130 · Unmeasured work: demonstrating that the ascertained hours in a daily average agreement are realistic
  • NMWM07140 · Unmeasured work: using a daily average agreement to calculate hours worked
  • NMWM07150 · More than one job with the same employer
  • NMWM07160 · Working for two or more employers
  1. Types of work: contents
  2. Types of work: time work

NMWM07040 | Types of work: time work

From HM Revenue & Customs · National Minimum Wage Manual

Relevant legislation

The legislation that applies to this page is as follows:

  • National Minimum Wage Regulations 2015, regulation 30

Time work is work, other than salaried hours work, in respect of which a worker is entitled under their contract to be paid.

There are three circumstances when work is time work.

  1. Where the worker is paid under his contract solely according to the length of time worked.

  2. Where the worker is paid under his contract according to his level of output over an hour (or other period of time) and the worker is required to work for a set period of time. [This contrasts with ‘output work’ (NMWM07060)].

For example, a piece worker in a factory is required to work for 8 hours each day. Although he is paid according to his output per hour, he is regarded as doing time work for National Minimum Wage purposes because he is required to be at work for a set period of time each day).

  1. Where the worker works as in 2 above, but is paid by the hour because he fails to reach the level of output per hour set by his contract.

For example, a piece worker is required to work for 9 hours per day and produce 4 garments per hour. He is normally paid per garment produced. However, if he only produces 3 garments per hour he is still paid for 9 hours work.

Time work may exist in any trade sector and in any occupation. For example, a worker will be regarded as doing time work if:

  • they do not meet the conditions for performing salaried hours work but their pay relates to the time worked or when they are expected to work

  • they do piecework according to set hours

  • they work on a commission-only basis according to set hours

  • they are paid in relation to set hours or times when they are expected to work.

  • their hours generally vary for each pay reference period