Official guidance
VAT Energy-Saving Materials and Grant-Funded Heating Supplies

VENSAV3000 · Energy-saving materials

  • VENSAV3010 · Introduction
  • VENSAV3020 · Rules applying to Great Britain with effect from 1 October 2019 until 31 March 2022 (while continuing to apply in Northern Ireland until 30 April 2023).
  • VENSAV3030 · Summary of changes
  • VENSAV3035 · Rules applying to Great Britain from 1 April 2022
  • VENSAV3036 · Rules applying to Northern Ireland from 1 May 2023
  • VENSAV3037 · Further expansion of the relief from 1 February 2024
  • VENSAV3040 · Insulation
  • VENSAV3050 · Controls for central heating and hot water systems
  • VENSAV3060 · Solar panels
  • VENSAV3061 · Electrical storage batteries
  • VENSAV3062 · Smart diverters
  • VENSAV3070 · Wind turbines and water turbines
  • VENSAV3080 · Ground source heat pumps and air source heat pumps
  • VENSAV3081 · Water source heat pumps
  • VENSAV3082 · Preparatory groundworks for water source heat pumps and ground source heat pumps
  • VENSAV3090 · Micro combined heat and power units and wood-fuelled boilers
  • VENSAV3100 · Meaning of residential accommodation
  • VENSAV3101 · meaning of buildings intended for use solely for a relevant charitable purpose
  • VENSAV3110 · social policy conditions applying to Great Britain between 1 October 2019 and 31 March 2022 and to Northern Ireland from 1 October 2019 and 30 April 2023
  • VENSAV3115 · the supply was to a qualifying person (the first social condition)
  • VENSAV3120 · the supply was to a relevant housing association (the second social condition)
  • VENSAV3130 · the supply was to a residential accommodation building intended for use for a relevant residential purpose (the third social condition)
  • VENSAV3140 · evidence to support that a social condition is satisfied
  • VENSAV3150 · meaning of the “open market value of the supply of the materials” and the “cost of the total supply”
  • VENSAV3160 · examples of how the 60% test worked
  • VENSAV3170 · accounting for VAT when the 60% threshold has been exceeded
  • VENSAV3180 · materials purchased in bulk
  • VENSAV3190 · temporary zero rate rules and transitional issues (Great Britain only)
  • VENSAV3195 · temporary zero rate rules and transitional issues (Northern Ireland)
  • VENSAV3200 · Energy-saving materials supplied with other works
  • VENSAV3210 · Single supplies of energy-saving materials
  • VENSAV3220 · Single zero-rated and standard-rated supplies
  • VENSAV3230 · Separate supplies
  • VENSAV3240 · Carving out energy-saving materials from a single supply
  • VENSAV3250 · Construction of new dwellings
  • VENSAV3260 · interaction between energy-saving materials supplied with other works and the 60% test (applicable to supplies made in Great Britain between 1 October 2019 and 31 March 2022 and in NI between 1 October 2019 and 30 April 2023).
  • VENSAV3270 · replacement roofs
  • VENSAV3280 · Replacement walls in prefabricated reinforced concrete (PRC) houses
  • VENSAV3290 · Meaning of ‘installation’
  • VENSAV3300 · Walkways and ladders
  • VENSAV3310 · Swimming pools
  • VENSAV3320 · Apportionment of energy-saving materials serving buildings used for both qualifying and non-qualifying purposes
  • VENSAV3330 · More than one job at the same premises
  • VENSAV3340 · Subcontractors
  1. Energy-saving materials: contents
  2. temporary zero rate rules and transitional issues (Northern Ireland)

VENSAV3195 | temporary zero rate rules and transitional issues (Northern Ireland)

From HM Revenue & Customs · VAT Energy-Saving Materials and Grant-Funded Heating Supplies

The new rules affected supplies of installations of energy-saving materials that had a time of supply on or after 1 May 2023. The time of supply is determined in accordance with the normal VAT accounting rules (usually the earliest of the date that the installation is completed, the date that the invoice is issued or the date that payment is made). If this is on or after 1 May 2023, the installation would have qualified for the zero rate. If an installation commenced before 1 May 2023 and a deposit was paid prior to 1 May 2023, then the deposit would have been reduced rated. However, if the final payment was made on or after 1 May 2023 this will have been zero rated.

PreviousNext