Official guidance
VAT Energy-Saving Materials and Grant-Funded Heating Supplies

VENSAV3000 · Energy-saving materials

  • VENSAV3010 · Introduction
  • VENSAV3020 · Rules applying to Great Britain with effect from 1 October 2019 until 31 March 2022 (while continuing to apply in Northern Ireland until 30 April 2023).
  • VENSAV3030 · Summary of changes
  • VENSAV3035 · Rules applying to Great Britain from 1 April 2022
  • VENSAV3036 · Rules applying to Northern Ireland from 1 May 2023
  • VENSAV3037 · Further expansion of the relief from 1 February 2024
  • VENSAV3040 · Insulation
  • VENSAV3050 · Controls for central heating and hot water systems
  • VENSAV3060 · Solar panels
  • VENSAV3061 · Electrical storage batteries
  • VENSAV3062 · Smart diverters
  • VENSAV3070 · Wind turbines and water turbines
  • VENSAV3080 · Ground source heat pumps and air source heat pumps
  • VENSAV3081 · Water source heat pumps
  • VENSAV3082 · Preparatory groundworks for water source heat pumps and ground source heat pumps
  • VENSAV3090 · Micro combined heat and power units and wood-fuelled boilers
  • VENSAV3100 · Meaning of residential accommodation
  • VENSAV3101 · meaning of buildings intended for use solely for a relevant charitable purpose
  • VENSAV3110 · social policy conditions applying to Great Britain between 1 October 2019 and 31 March 2022 and to Northern Ireland from 1 October 2019 and 30 April 2023
  • VENSAV3115 · the supply was to a qualifying person (the first social condition)
  • VENSAV3120 · the supply was to a relevant housing association (the second social condition)
  • VENSAV3130 · the supply was to a residential accommodation building intended for use for a relevant residential purpose (the third social condition)
  • VENSAV3140 · evidence to support that a social condition is satisfied
  • VENSAV3150 · meaning of the “open market value of the supply of the materials” and the “cost of the total supply”
  • VENSAV3160 · examples of how the 60% test worked
  • VENSAV3170 · accounting for VAT when the 60% threshold has been exceeded
  • VENSAV3180 · materials purchased in bulk
  • VENSAV3190 · temporary zero rate rules and transitional issues (Great Britain only)
  • VENSAV3195 · temporary zero rate rules and transitional issues (Northern Ireland)
  • VENSAV3200 · Energy-saving materials supplied with other works
  • VENSAV3210 · Single supplies of energy-saving materials
  • VENSAV3220 · Single zero-rated and standard-rated supplies
  • VENSAV3230 · Separate supplies
  • VENSAV3240 · Carving out energy-saving materials from a single supply
  • VENSAV3250 · Construction of new dwellings
  • VENSAV3260 · interaction between energy-saving materials supplied with other works and the 60% test (applicable to supplies made in Great Britain between 1 October 2019 and 31 March 2022 and in NI between 1 October 2019 and 30 April 2023).
  • VENSAV3270 · replacement roofs
  • VENSAV3280 · Replacement walls in prefabricated reinforced concrete (PRC) houses
  • VENSAV3290 · Meaning of ‘installation’
  • VENSAV3300 · Walkways and ladders
  • VENSAV3310 · Swimming pools
  • VENSAV3320 · Apportionment of energy-saving materials serving buildings used for both qualifying and non-qualifying purposes
  • VENSAV3330 · More than one job at the same premises
  • VENSAV3340 · Subcontractors
  1. Energy-saving materials: contents
  2. Energy-saving materials: energy-saving materials supplied with other works

VENSAV3200 | Energy-saving materials: energy-saving materials supplied with other works

From HM Revenue & Customs · VAT Energy-Saving Materials and Grant-Funded Heating Supplies

When energy-saving materials are installed at the same time as other materials, it is necessary to determine whether they constitute a single supply or multiple supplies, in line with the principles established by the European Court of Justice judgment in Card Protection Plan (CPP) and subsequent decisions.

There is a single supply where one element of the supply is the principal element to which all the other elements are ancillary, integral or incidental. An ancillary element does not constitute, for the customer, an aim in itself, but is a means of its better enjoying the principal supply. Integral elements are elements that are essential, necessary or incidental to the main supply. An incidental element is something that naturally accompanies the main supply, such as the packaging of energy-saving materials.

Indicators of a single supply include:

  • a single price;

  • the supply is advertised as a package;

  • the components are not available separately;

  • the installation of all the components is carried out at the same time;

  • the customer perceives that what it is getting is a single supply.

There is a multiple supply where one or more element is distinct and independent. Indicators of more than one supply taking place include:

  • separate pricing or invoicing;

  • the items are available separately;

  • there is a time differential between parts of the supply;

  • elements of the supply are not inter-dependent or connected.

There are three possible liability outcomes if energy-saving materials are supplied with other materials. For further information see VATSC11100